Clay M
Agent
- Joined
- Jul 7, 2002
- Messages
- 25
Well, after 7 weeks of almost non-stop work, my HT and basement are pretty much done. We finished about 1500 sqft of the basement at the same time we did the HT.
This was my first stab at building a dedicated HT, but we're very pleased at how it turned out.
http://www.marlowgroup.net/pics/hometheater/
This was my first stab at building a dedicated HT, but we're very pleased at how it turned out.
http://www.marlowgroup.net/pics/hometheater/