The fabric and chair rail molding is installed on the rack wall and column, the racks and equipment are installed. The racks pull out, but they are also accessible from the back.
The fabric is done, sconces and chair rail molding are installed, still need to install crown molding around columns. The smoke detector above the door and the HVAC vents have been painted black.
The fabric is done, sconces and chair rail molding are installed, still need to install crown molding around columns. The white piece of paper is a mockup of the multi-button light switch.