Dan_D
Stunt Coordinator
- Joined
- Jun 18, 2001
- Messages
- 98
well i got all my electronics from Adire and am quite pleased with everything. I got my box all hooked up, i put the 60oz of polyfill in, and fired her up. Unfortunatly polyfill shot out the ports all over. hah
This is the Adire Tempest Alignment, all to spec from the plans on Adire's website. It called for 64oz of polyfill, i had trouble finding room for the 60oz i had. every cubic inch was filled in the ~7.5ft^3 box. around ports, over ports, pretty much packed everywhere.. is this way too much? evidently i guess since it shot out. should i pack it so that its below the port hight? (fires down so ports stand up) should i even pack it at all? i packed it as little as possible.
if anyone could give me some polyfill pointers, thatd be fantastic.
Also i have just a recessed mounting hole cut for the AVA250 amp. its screwed in place and sealed. This is ok right? the amp seemed solid enough to hold up to the pressure, but i want to be sure i dont tear it up.
thanks,
Dan
------------------
This is the Adire Tempest Alignment, all to spec from the plans on Adire's website. It called for 64oz of polyfill, i had trouble finding room for the 60oz i had. every cubic inch was filled in the ~7.5ft^3 box. around ports, over ports, pretty much packed everywhere.. is this way too much? evidently i guess since it shot out. should i pack it so that its below the port hight? (fires down so ports stand up) should i even pack it at all? i packed it as little as possible.
if anyone could give me some polyfill pointers, thatd be fantastic.
Also i have just a recessed mounting hole cut for the AVA250 amp. its screwed in place and sealed. This is ok right? the amp seemed solid enough to hold up to the pressure, but i want to be sure i dont tear it up.
thanks,
Dan
------------------