After about two months of planning I nailed in the first board of my HT. I'm starting with all the top plates of the walls first. Using a plumb bob I will then install the sole plates and then the studs. I have a good book on carpentry for reference. As soon as I figure out how to post pictures, I will keep posting updates as I go. This stuff is FUN!
Dan
Dan