John S Smith
Agent
- Joined
- Dec 16, 2001
- Messages
- 41
...unfinished ceiling, running cable, dedicated circuits, "future" conduits, home runs to distribution points, Hubs for voice/data/video....AAARGGHHH!
Never even been in a real HT (stores don't count, lousy company and no beer!)But determined to pull it all together some time this century, HT or the closest I can get to it, room is probably a sound nightmare, glass doors down both walls, hardwood floors, open to kitchen and living room and hallway/staircase! Realise now that there is no such thing as a finished HT, also that I, (1) Don't know jack about any of this "stuff" (2)Need to concentrate on installing a basic system untill I can figure it all out (3) need to stop mental upgrading based on what you guys have learnt over the years.
Many thanks to all members for a great forum where civility is the norm.
Now where is that F#%^&^ hammer..........
..john
Never even been in a real HT (stores don't count, lousy company and no beer!)But determined to pull it all together some time this century, HT or the closest I can get to it, room is probably a sound nightmare, glass doors down both walls, hardwood floors, open to kitchen and living room and hallway/staircase! Realise now that there is no such thing as a finished HT, also that I, (1) Don't know jack about any of this "stuff" (2)Need to concentrate on installing a basic system untill I can figure it all out (3) need to stop mental upgrading based on what you guys have learnt over the years.
Many thanks to all members for a great forum where civility is the norm.
Now where is that F#%^&^ hammer..........
..john