Flexi Rack Pics

Discussion in 'Archived Threads 2001-2004' started by EddieN, Feb 5, 2001.

  1. EddieN

    EddieN Agent

    Joined:
    Sep 23, 2000
    Messages:
    35
    Likes Received:
    0
    Trophy Points:
    0
  2. Mike Boniferro

    Mike Boniferro Second Unit

    Joined:
    Aug 21, 1999
    Messages:
    273
    Likes Received:
    0
    Trophy Points:
    0
    very nice looking... cool idea for joining the two sides.
    How sturdy is the setup?
     
  3. MattE

    MattE Extra

    Joined:
    Jan 1, 2001
    Messages:
    17
    Likes Received:
    0
    Trophy Points:
    0
    Nice but hide those ugly wires [​IMG]
     
  4. EddieN

    EddieN Agent

    Joined:
    Sep 23, 2000
    Messages:
    35
    Likes Received:
    0
    Trophy Points:
    0
    Thanks guys, it's really sturdy actually. I'm using 1/2" threaded rods, the local Home Depot didn't have the 3/4" rods. The wire management portion of this project is for this weekend. I finally got the rack done late Sunday.
    ------------------
    - Eddie
     
  5. Jon_B

    Jon_B Screenwriter

    Joined:
    Nov 27, 2000
    Messages:
    1,025
    Likes Received:
    0
    Trophy Points:
    0
    Looks like you put quite a bit of time into that. Nice Job.
    Jon
     
  6. EddieN

    EddieN Agent

    Joined:
    Sep 23, 2000
    Messages:
    35
    Likes Received:
    0
    Trophy Points:
    0
    Thanks Jon ..
    Andy, it took me about 7 hours to build and then another 3 hours to put all the equipment on, it was actually quite easy to build.
    ------------------
    - Eddie
     
  7. BrettK

    BrettK Agent

    Joined:
    Sep 25, 2000
    Messages:
    37
    Likes Received:
    0
    Trophy Points:
    0
    3 hours to put the equipment on?
    Just curious why it took so long. Wiring?
    Edit: Great rack, btw!
     
  8. Andrew Pratt

    Andrew Pratt Producer

    Joined:
    Dec 8, 1998
    Messages:
    3,806
    Likes Received:
    0
    Trophy Points:
    0
    looks much better then it did. how are you planning on hiding the wires?
    ------------------
    The Pratt Home Theater
     
  9. EddieN

    EddieN Agent

    Joined:
    Sep 23, 2000
    Messages:
    35
    Likes Received:
    0
    Trophy Points:
    0
    Yup 3 hours, the wiring, getting the shelves spaced out enough so the equipment can breath, and leveling the shelves out. One of the best things to buy when building a Flexi is a Level.
    Andrew, this weekend I plan on going to a comptuer store and getting 1.5 inch loom. They sell 20 feet for 20 dollars. I'm thiking 20 feet should be enough.
    Thanks for the compliments guys.
    ------------------
    - Eddie
     

Share This Page