#1 of 96 SteveFred

SteveFred

    Stunt Coordinator

  • 79 posts
  • Join Date: Apr 05 2004

Posted August 13 2004 - 05:06 PM

Well its offical LOL(ordered everything)

Optoma H77
Lexicon RV-8
IScanHD with SDI
Pioneer DV59-Avi with SDI
Rockets by Onix 7 channel package
SVS PB2 plus
Da-lite CV 119" fixed wall scrren with pro-edge

Now I finally moved into my new house and boy am I pooped, we moved everthing ourselves.

Had the materials for the basement delivered though

I just had 45 sheets of 4x8 and 45 sheets of 4x12 Drywall delivered and Home Depot is delivering over 200 2x4's, 2x6's etc, about 2000 Linear feet of insulation.

So its time to get cracking on the home theater(have to build a craft room for the misses and a 3rd bath and, etc)

The whole walkout basement is 2000 sq ft so you get the idea. I will post a ton of pics as I go . I will be doing 100% of the work myself, so I hope to be done with the HT room in 8 weeks and the rest of the basement by spring.

Steve

#2 of 96 Will d s

Will d s

    Stunt Coordinator

  • 75 posts
  • Join Date: Jun 20 2004

Posted August 13 2004 - 09:30 PM

Sounds like a fun project Steve, can't wait to see the pictures start rolling in.

#3 of 96 SteveFred

SteveFred

    Stunt Coordinator

  • 79 posts
  • Join Date: Apr 05 2004

Posted August 14 2004 - 10:42 AM

Thanks Posted Image

And here we go, Home depot delivered everything and I just got done taking everything into the basement.

Materials side of house:

www.stevesreefroom.com/DSCN4107.JPG

www.stevesreefroom.com/DSCN4108.JPG

Materials in basement, Im pooped Posted Image

www.stevesreefroom.com/DSCN4109.JPG

www.stevesreefroom.com/DSCN4113.JPG

www.stevesreefroom.com/DSCN4114.JPG


Spot for the HT
www.stevesreefroom.com/DSCN4111.JPG

#4 of 96 Parker Clack

Parker Clack

    Executive Producer

  • 12,087 posts
  • Join Date: Jun 30 1997
  • Real Name:Parker
  • LocationKansas City, MO

Posted August 14 2004 - 12:57 PM

Steve:

Looks great. I look forward to seeing pictures of your progress.

Parker

"I tried to get my medical records from the company but they say they

are confidential and can only be released to other insurance companies,

pharmaceutical​ reps, suppliers of medical equipment and for some

reason the RNC."
 


#5 of 96 SteveFred

SteveFred

    Stunt Coordinator

  • 79 posts
  • Join Date: Apr 05 2004

Posted August 16 2004 - 02:47 PM

Ok the craft room is framed and the HT room is about 1/3 done Posted Image

Home theater room

www.stevesreefroom.com/DSCN4122.JPG

Craft room for the misses Posted Image

www.stevesreefroom.com/DSCN4123.JPG

www.stevesreefroom.com/DSCN4125.JPG

and the SVS PB2+Sub came in today (just ordered it Thursday)

www.stevesreefroom.com/DSCN4127.JPG


I Should have the HT room framed by Friday Posted Image I am relentless when it comes to things I want done, but the dishes well they can wait, hehe.

Steve

#6 of 96 Jim_Ski

Jim_Ski

    Agent

  • 31 posts
  • Join Date: Mar 16 2004

Posted August 17 2004 - 12:53 AM

Steve,

good luck! I just finished an ~1100 sf basement, and it took me a tad over 8 weeks (roughly a year Posted Image ) As a matter of fact we should have our final inspection(s) tomorrow (hooray).

One thing I did that I'd recommend is putting a subfloor down over the concrete. I used Dricore (www.dricore.com) and have been happy with it (I used it under carpet and pergo). Keep in mind you'll need to make sure your door openings compensate for any change in flooring.

A word of caution: once you finish that theater... the rest of the basement is sure to suffer slowdowns! Posted Image

#7 of 96 Scott Wong

Scott Wong

    Second Unit

  • 421 posts
  • Join Date: Oct 30 1999

Posted August 17 2004 - 01:49 AM

Steve:

I'm really looking forward to seeing more of the progress, as well!


#8 of 96 SteveFred

SteveFred

    Stunt Coordinator

  • 79 posts
  • Join Date: Apr 05 2004

Posted August 17 2004 - 01:54 AM

Actually I was just telling my fiance that last night. I will finish the 2 rooms in about 8 weeks and the rest of the basement in 8 months, heheheh.

I will look into the sub-floor, but I am reaching my limit funds wise and with the walkout basement and padding underneath the carpet I should be fine.

I know alot of times its not wise to have padding in the basement, because its like a sponge if water gets to it, but we had like 8" of rain in 2 days back in June and not 1 drop in the basement and the sump was dry and there were not even any gutter on at that time.

What is the price sq footage wise? and is it easy to install?

Steve

#9 of 96 Jim_Ski

Jim_Ski

    Agent

  • 31 posts
  • Join Date: Mar 16 2004

Posted August 17 2004 - 06:50 AM

it's roughly $5 per 4 sq ft section (2'x2').

Even though water is not seeping in (good thing), moisture still will come up through your floor and may cause annoyances (stains, mold, smells). I notice you're in WI so may have chilly winters. I'm in MN myself, and the small R-factor was a big win for me. Dricore claims an R-2 with about an 8 degree increase in floor temp.

It was a breeze to install as it's floating and nail/glue-less (tongue-and-groove).

#10 of 96 BrianKR

BrianKR

    Second Unit

  • 498 posts
  • Join Date: Oct 19 2002

Posted August 17 2004 - 10:32 AM

Quote:
Materials in basement, Im pooped Posted Image


I feel your pain in reverse.
I just got done hauling 36 sheets of busted up drywall upstairs and outside. I am rebuilding my HT room and adding a bathroom in the basement. It's a ton of work, but it's a great feeling doing it yourself.

Good luck to you on your project.Posted Image
I look forward to seeing pictures of your progress.

#11 of 96 SteveFred

SteveFred

    Stunt Coordinator

  • 79 posts
  • Join Date: Apr 05 2004

Posted August 17 2004 - 03:09 PM

Thanks Posted Image

I put up 24 more feet of wall tonight, no pics though, camera needs batteries. Tomorrow night I will build shelves in the mechanical area for my fiance. So back to the HT room on Thursday, I only have about 24ft of wall to go, but the corner will be a 45deg turn, so it will take a bit longer

I hope to get that up by friday and have all the electrical run Sat and HVAC Sunday Posted Image

Steve

#12 of 96 Ron-P

Ron-P

    Producer

  • 6,283 posts
  • Join Date: Jul 25 2000
  • Real Name:Ron

Posted August 18 2004 - 04:24 AM

Excellent Steve, keep the pics coming. Half the fun of my HT was building it.

If you can, shrink down the size of your pics. Even with my high-speed connection they are slow loading.
You have all the weapons you need...Now fight!


#13 of 96 SteveFred

SteveFred

    Stunt Coordinator

  • 79 posts
  • Join Date: Apr 05 2004

Posted August 18 2004 - 01:58 PM

Yes I think it is alot of fun building it up from scratch Posted Image

OK here are a few more pics. I had to put up shelves, so only got one more wall in plus figured out the 45deg corner.

Here is a few more pics(darn camera is not focusing right, urgh)

http://www.stevesree...om/DSCN4128.JPG

http://www.stevesree...om/DSCN4129.JPG

http://www.stevesree...om/DSCN4130.JPG

Finally pulled the SVS out of the box and my 750 sig Rockets and all I have to say is DAMMMMMMMMM, and I thought I had here bass before.

http://www.stevesree...om/DSCN4132.JPG

http://www.stevesree...om/DSCN4134.JPG

Steve

#14 of 96 SteveFred

SteveFred

    Stunt Coordinator

  • 79 posts
  • Join Date: Apr 05 2004

Posted August 21 2004 - 09:19 AM

The Framing is 99% done, I just have to frame in the equipment rack.

Here are a few more pics.


Had to frame in the duct/beam and the water pipes which was a pain to get level
http://www.stevesree...om/DSCN4138.JPG

The 8" Riser
http://www.stevesree...om/DSCN4139.JPG

and the equipment rack space and door to access from behind
http://www.stevesree...om/DSCN4140.JPG



I hope to get the wiring electical wiring done tomorrow. I will be puting in

12 recessed lights in the HT room(24x15 room)
3 recessed lights in the equipment room(12x3.5 room)
6 or 8 wall sconces in the HT room
9 recessed lights in the craft room(12x14 room)

Steve

#15 of 96 SteveFred

SteveFred

    Stunt Coordinator

  • 79 posts
  • Join Date: Apr 05 2004

Posted August 22 2004 - 12:14 PM

Well I am 8 days into the HT construction Posted Image

The rough in of the electrical is 95% done(still have to wire the recessed lights) and 75% of the HT cables/speakers wire/etc are in.
Hope to be donng the HVAC tuesday and the Insulation by Thursday.

http://www.stevesree...om/DSCN4143.JPG

http://www.stevesree...om/DSCN4144.JPG

Time to go watch a movie Posted Image

Steve

#16 of 96 Parker Clack

Parker Clack

    Executive Producer

  • 12,087 posts
  • Join Date: Jun 30 1997
  • Real Name:Parker
  • LocationKansas City, MO

Posted August 23 2004 - 10:39 AM

Looking good. I'll bet that each time you go into that room you can hardly wait for it to get done.

Parker

"I tried to get my medical records from the company but they say they

are confidential and can only be released to other insurance companies,

pharmaceutical​ reps, suppliers of medical equipment and for some

reason the RNC."
 


#17 of 96 BrianKR

BrianKR

    Second Unit

  • 498 posts
  • Join Date: Oct 19 2002

Posted August 23 2004 - 11:56 AM

WOW you are kickn bootie Steve! Posted Image
What did you use to build your equipment rack?
It looks nice and solid.

#18 of 96 SteveFred

SteveFred

    Stunt Coordinator

  • 79 posts
  • Join Date: Apr 05 2004

Posted August 23 2004 - 03:43 PM

Hey Parker, yes you are right, I actually am hoping to finish just before the Packers opening in 3 weeks, but the finished work will slow me down. Plus the wifes is getting sick of me re-arranging the living room to project the picture on the back wall, hehehe.

Brian, the equipment rack believe it or not was part of a entertainment center that didn't fit into our master bedroom, so I cut the equipment rack off and ended up making a nice TV stand for the 32" in the bedroom.

I will finish the HVAC tomorrow night and will also have the rough in electrical/cable/speaker wire finished.

If I push, I will have the insulation and drywall up by Sunday night, but we will see Posted Image

Then comes the mudding of the drywall, not looking forward to that Posted Image

Steve

#19 of 96 Conrad Ebel

Conrad Ebel

    Agent

  • 32 posts
  • Join Date: Aug 19 2003

Posted August 24 2004 - 05:56 AM

Good luck and stay motivated. I decided to not buy the projector until my theater is done. Otherwise, I'd just want to sit around and watch movies instead of working on the HT. The result has been me working on it every waking moment. Posted Image

I don't know if it's too late, but you may want to add a few inches to that riser. Depending on your seating setup, 8" may not be enough. Just an observation that many people have had. I went with a 10.5" riser. No word on the results yet though as my couches are still in the garage waiting for the riser to be carpeted, and for the room to be painted.

#20 of 96 SteveFred

SteveFred

    Stunt Coordinator

  • 79 posts
  • Join Date: Apr 05 2004

Posted August 24 2004 - 03:40 PM

I still have time to add a few inches to the riser, but on one side my the ceiling is 6'10" and witht he riser its 6'2", and a 10" riser will bring it to 6' even, but thats only one chair out of 7.

True I want to watch the projector, but it isnt slowing me down. I have the heating/cooling supply/returns done and just have the 8 recessed light to wire tomorrow and then I will drywall the outside walls so I can insulation the walls without it falling right through.

If I stay on my time schedule I might be done by Monday night football on the 13th of Sept.

Steve