17’4” x 14’5” x 8’9” verses 22’6” x 14’5” x 8’9”
I’m anxious to start construction on theater and have a question. The area of the basement I’m considering measures 17’4” x 14’5” x 8’9”. Directly behind this area is a rough-in for a bathroom. I can extend the length of the room by 5’2” if I re-plum the bath.
My question – is it worth the expense / labor to add an extra 5’2” to the length of my HT. I have not priced the effort, but I assume busting up the concrete floor will not be cheap or easy.
A picture of my previous HT is attached. We just moved and I need to start construction!

I’m anxious to start construction on theater and have a question. The area of the basement I’m considering measures 17’4” x 14’5” x 8’9”. Directly behind this area is a rough-in for a bathroom. I can extend the length of the room by 5’2” if I re-plum the bath.
My question – is it worth the expense / labor to add an extra 5’2” to the length of my HT. I have not priced the effort, but I assume busting up the concrete floor will not be cheap or easy.
A picture of my previous HT is attached. We just moved and I need to start construction!




