View Single Post
Old 05-03-2005, 09:31 AM   #9 of 16
Philip_G
Member
 
Join Date: Nov 2000
Local Time: 02:06 AM
Local Date: 12-05-2008
Posts: 5,542

Send a message via ICQ to Philip_G
Did you cut it at the floor level, or at the top of the quarter round?

also, did you guys pull the existing baseboard and put the floor down, or lay the floor down leaving the 1/4" or so gap required between the floor and baseboard? Maybe that's where I'm getting confused.


Philip_G is offline Quote this post in a PM Send Support Ticket Reply With Quote sendpm.gif